Office budget and spending
Every MP gets an annual budget to run their Ottawa and riding offices: staff, travel, mail-outs and contracts. It isn’t money for local projects.
Office budget for 2026–27, set by the House of Commons Board of Internal Economy
- Basic budget (same for every MP)$441,600
- Elector supplement (many voters)$38,910
- Geographic supplement (large area)$25,090
$136,332 spent in the first quarter of 2026–27, 27% of the year’s budget.
Spending reported by the office
| Quarter | Staff salaries | Travel | Hospitality | Contracts | Total |
|---|---|---|---|---|---|
| Apr–Jun 2025 | $73,729 | $10,589 | $0 | $26,848 | $111,166 |
| Jul–Sep 2025 | $112,512 | $7,420 | $0 | $17,999 | $137,931 |
| Oct–Dec 2025 | $112,496 | $13,527 | $484 | $28,944 | $155,451 |
| Jan–Mar 2026 | $133,025 | $14,778 | $0 | $21,164 | $168,967 |
| Apr–Jun 2026 | $91,897 | $15,663 | $64 | $28,709 | $136,332 |
| Since April 2025 | $523,658 | $61,977 | $548 | $123,665 | $709,847 |
April to June 2025 can include spending by the previous MP before the election on April 28, 2025. Constituency office rent and some central costs are paid from other budgets and aren’t shown here.
Federal projects in this riding
Infrastructure Canada projects in the towns and cities of Algonquin—Renfrew—Pembroke: transit, water, housing, recreation and more. Programs approve the funding, not individual MPs, so this shows what was funded here, not what one person delivered.
- Federal money
- $54.8M
- Completed
- 91
- Under construction
- 3
- Not started
- 0
Showing 40 of 94 projects, newest approval first
-
Transit Needs Assessment and Feasibility Study for the Town of Petawawa, ONUnder construction$50,000federal, of $66.0K total cost
-
Acquisition of an accessible passenger vanCompleted$65,000federal, of $162.5K total cost
-
Construction of Multi-use Pathway along Laurentian DriveCompleted$96,000federal, of $435.5K total cost
-
Algonquin Trail North Active Transportation EnhancementsCompleted$1,470,000federal, of $2.5M total cost
-
Bennet Street and Boundary Road Watermain Replacement and Taylor Bridge Watermain SuspensionCompleted$1,909,000federal, of $4.8M total cost
-
Rehabilitation of Watermains in the Town of RenfrewCompleted$1,999,990federal, of $4.6M total cost
-
Town of Deep River Drinking Water Treatment Plant UpgradeUnder construction$1,540,000federal, of $3.9M total cost
-
Rehabilitation of Algonquin Trail/OVRTCompleted$204,559federal, of $255.7K total cost
-
Swinging Bridge Repairs (Pedestrian Foot Bridge)Completed$146,938federal, of $183.7K total cost
-
Ma-te-Way Activity Centre ExpansionCompleted$6,440,587federal, of $16.1M total cost
-
Boundary Road Pedestrian Path ConstructionCompleted$132,968federal, of $166.2K total cost
-
Bonnechere Manor Long-Term Care Home: Retrofit of HVAC systemCompleted$778,158federal, of $972.7K total cost
-
Upgrade HVAC SystemCompleted$664,000federal, of $830.0K total cost
-
Construction of Multi-Use Pathway-Laurentian DriveCompleted$80,000federal, of $100.0K total cost
-
Miramichi Lodge Humidifier ReplacementCompleted$56,739federal, of $70.9K total cost
-
Rehabilitation of the Nobel Community CenterCompleted$80,000federal, of $100.0K total cost
-
HVAC Upgrades; Portable Replacement; Installation of Bottle Filling StationsCompleted$1,214,925federal, of $1.5M total cost
-
Indoor HVAC systems upgradeCompleted$892,000federal, of $1.1M total cost
-
HVAC System UV Treatment; HVAC Duct Sealing; VentilationCompleted$2,246,845federal, of $2.8M total cost
-
HVAC System UV Treatment; HVAC Duct SealingCompleted$1,202,321federal, of $1.5M total cost
-
Window ReplacementCompleted$173,895federal, of $217.4K total cost
-
HVAC Upgrades; Portable Replacement; Installation of Bottle Filling StationsCompleted$1,484,379federal, of $1.9M total cost
-
Laurentian Hills Wastewater System Treatment UpgradesUnder construction$1,164,468federal, of $2.9M total cost
-
Reconstruction of a Section of Pembroke Street WestCompleted$1,968,741federal, of $3.9M total cost
-
Reconstruction of Ross Street and Arnprior AvenueCompleted$327,736federal, of $655.5K total cost
-
Nobel Water System LoopingCompleted$61,089federal, of $126.2K total cost
-
Parkdale Avenue sanitary sewer main replacementCompleted$81,432federal, of $162.9K total cost
-
Huron Street sanitary sewer main reliningCompleted$12,200federal, of $24.4K total cost
-
Wastewater Treatment Plant - Supervisory Control and Data Acquisition (SCADA) System UpgradesCompleted$65,000federal, of $130.0K total cost
-
Wastewater Treatment Plant - 3 Sequencing Batch Reactor, Sequencing batch reactor ValvesCompleted$13,102federal, of $40.0K total cost
-
Minor upgrades to the raw water intake & pumping and piping systems low lift pumping stationCompleted$34,705federal, of $69.4K total cost
-
Upgrade existing watermain on Mary Street to 300mmm diameter lineCompleted$273,249federal, of $1.6M total cost
-
Design and Construction of the McGee Liftstation ReplacementCompleted$646,905federal, of $1.9M total cost
-
Trenchless Technology Spot Repairs of Multiple Storm Sewer Pipes on County Road 2 / Daniel Street, ArnpriorCompleted$10,000federal, of $20.0K total cost
-
Trenchless Technology for Multiple Storm Sewer Pipes and Rebuild of Deteriorating Structures County Road 73 in Deep RiverCompleted$3,765federal, of $20.0K total cost
-
Rehabilitation of water, sewer and road infrastructure on Plaunt Street (Phase2) from Railway Avenue to dead endCompleted$517,331federal, of $2.0M total cost
-
Replace existing accessible busCompleted$41,142federal, of $150.0K total cost
-
Replace existing accessible vanCompleted$25,291federal, of $58.0K total cost
-
Acquisition of tire changer and balancer to enhance fleet maintenanceCompleted$2,707federal, of $10.0K total cost
-
Plaunt Street South RehabilitationCompleted$633,685federal, of $1.9M total cost
How to read this page
- The office budget pays for the MP’s staff and offices. Infrastructure money flows through federal programs, often with provinces and cities, and goes to the recipient listed on each project.
- Projects are matched to ridings by the town or city named in Infrastructure Canada’s records. A project in a city covering several ridings is counted as “shared” and left out of the totals unless you include it.
- Status comes from reported construction dates. Some projects finish before their dates are updated.