Office budget and spending
Every MP gets an annual budget to run their Ottawa and riding offices: staff, travel, mail-outs and contracts. It isn’t money for local projects.
Office budget for 2026–27, set by the House of Commons Board of Internal Economy
- Basic budget (same for every MP)$441,600
- Elector supplement (many voters)$38,910
- Geographic supplement (large area)$7,180
No spending reports were found for this MP yet. New MPs appear after their first full quarter.
Federal projects in this riding
Infrastructure Canada projects in the towns and cities of Brantford—Brant South: transit, water, housing, recreation and more. Programs approve the funding, not individual MPs, so this shows what was funded here, not what one person delivered.
- Federal money
- $92.5M
- Completed
- 56
- Under construction
- 3
- Not started
- 2
Showing 40 of 61 projects, newest approval first
-
Building Sustainability: Port Rowan Community Centre Retrofits and UpgradesNot started$1,510,000federal, of $1.9M total cost
-
Lorne Bridge Trail RealignmentCompleted$316,972federal, of $528.3K total cost
-
City of Brantford Active Transportation Master PlanCompleted$50,000federal, of $300.0K total cost
-
Re-Energizing Healthy Living: Retrofitting the Simcoe Seniors Recreation Centre for a Green and Inclusive FutureNot started$2,484,000federal, of $3.1M total cost
-
Reducing CO2 Emissions: Norfolk County Public Library Waterford BranchUnder construction$300,960federal, of $376.2K total cost
-
Port Rowan Water Treatment Plant ImprovementsUnder construction$2,000,000federal, of $5.0M total cost
-
Woodman Pool and Playground ReplacementCompleted$1,810,100federal, of $4.5M total cost
-
D'Aubigny Creek Park Trail RealignmentCompleted$161,460federal, of $201.8K total cost
-
Wayne Gretzky Parkway Trail ReconstructionCompleted$222,459federal, of $278.1K total cost
-
Powerline Road Trail ReconstructionCompleted$191,588federal, of $239.5K total cost
-
Senior's Air Quality Systems (LTC and Rec Centre)Completed$349,403federal, of $436.8K total cost
-
Rehabilitation of Community HallCompleted$79,289federal, of $99.1K total cost
-
Pedestrian Walkways and Trail Signage - SimcoeCompleted$160,800federal, of $201.0K total cost
-
HVAC System UpgradeCompleted$845,174federal, of $1.1M total cost
-
Dressing Rooms Expansion/Enhancement ProjectCompleted$1,320,000federal, of $3.3M total cost
-
Central Public Works Maintenance Facility RetrofitCompleted$80,000federal, of $100.0K total cost
-
HVAC upgrades (Ventilation); Physcially Distant Classroom; Bottled Water Filling Stations; Portable Replacement; Open Concept SchoolsCompleted$1,250,454federal, of $1.6M total cost
-
Wifi Access points; touchless Door Handles; Daycare (installation/replacement of sinks, exterior door, washrooms, vestibule)Completed$288,454federal, of $360.6K total cost
-
Portable replacementsCompleted$960,000federal, of $1.2M total cost
-
Enclosing Open Concept Classrooms; HVAC; Water filling Station; Hallway door hold open devices; Entrance door security accessCompleted$4,738,688federal, of $5.9M total cost
-
Accessible Shelving for LibrariesCompleted$151,200federal, of $378.0K total cost
-
Roof Replacement Norwich Community Centre/ArenaCompleted$165,000federal, of $660.0K total cost
-
Kitchen RenovationCompleted$153,073federal, of $382.7K total cost
-
Replacement of Big Creek Bridge on Long Point CausewayCompleted$2,500,000federal, of $5.0M total cost
-
Replacement of the Roy BridgeCompleted$2,684,219federal, of $4.5M total cost
-
Replacement of On Board Equipment on Conventional and Specialized BusesCompleted$814,000federal, of $2.0M total cost
-
Bus Pad and Shelter ReplacementCompleted$330,000federal, of $676.6K total cost
-
Transit Maintenance Facility UpgradesCompleted$414,000federal, of $738.0K total cost
-
Conventional and Specialize Bus ProcurementCompleted$3,995,200federal, of $10.0M total cost
-
Braneida Park Phase IX Stormwater Management Pond (Facility ID 07F001DP) Sediment Removal and Clean OutCompleted$67,620federal, of $309.7K total cost
-
Turtle Pond Stormwater Management Pond Sediment Removal and Clean OutCompleted$267,257federal, of $534.5K total cost
-
Stormwater Collection Network Assessment and StudyCompleted$34,754federal, of $132.7K total cost
-
Upgrading of existing 300mm Sanitary Sewer on Greenwich Drive to 450mmCompleted$1,797,788federal, of $3.6M total cost
-
Wastewater Treatment Plant Electrical Transformer ReplacementCompleted$1,471,749federal, of $3.7M total cost
-
Shellard Lane Storm Water Management Pond Capital RehabilitationCompleted$193,594federal, of $388.5K total cost
-
Dufferin Street Drain Rehabilitation Project which services 85 households in the Village of NorwichCompleted$50,000federal, of $110.0K total cost
-
College Street Area water main, wastewater main, and storm sewer upgradesCompleted$1,336,330federal, of $3.1M total cost
-
Transit Stop and Shelter Inventory and Condition AssessmentCompleted$8,115federal, of $125.0K total cost
-
Downtown Transit Terminal RenovationsCompleted$300,000federal, of $600.0K total cost
-
Market Parkade Rehabilitation and RepairsCompleted$2,150,000federal, of $4.3M total cost
How to read this page
- The office budget pays for the MP’s staff and offices. Infrastructure money flows through federal programs, often with provinces and cities, and goes to the recipient listed on each project.
- Projects are matched to ridings by the town or city named in Infrastructure Canada’s records. A project in a city covering several ridings is counted as “shared” and left out of the totals unless you include it.
- Status comes from reported construction dates. Some projects finish before their dates are updated.