Quebec
Notre-Dame-de-Grâce—Westmount
Data updated November 26, 2026.
Talk to your MP’s office
Updates and events from the verified MP office, and questions and feedback from people in Notre-Dame-de-Grâce—Westmount. Please follow the community guidelines.
Loading the conversation…
Loading posts…
Office budget and spending
Every MP gets an annual budget to run their Ottawa and riding offices: staff, travel, mail-outs and contracts. It isn’t money for local projects.
Office budget for 2026–27, set by the House of Commons Board of Internal Economy
- Basic budget (same for every MP)$441,600
- Elector supplement (many voters)$25,970
$111,729 spent in the first quarter of 2026–27, 24% of the year’s budget.
Spending reported by the office
| Quarter | Staff salaries | Travel | Hospitality | Contracts | Total |
|---|---|---|---|---|---|
| Apr–Jun 2025 | $54,245 | $6,729 | $281 | $22,558 | $83,813 |
| Jul–Sep 2025 | $91,176 | $4,443 | $269 | $16,732 | $112,620 |
| Oct–Dec 2025 | $67,537 | $17,535 | $809 | $16,206 | $102,088 |
| Jan–Mar 2026 | $108,865 | $6,304 | $897 | $43,916 | $159,982 |
| Apr–Jun 2026 | $77,556 | $11,773 | $403 | $21,997 | $111,729 |
| Since April 2025 | $399,379 | $46,784 | $2,660 | $121,409 | $570,232 |
April to June 2025 can include spending by the previous MP before the election on April 28, 2025. Constituency office rent and some central costs are paid from other budgets and aren’t shown here.
Federal projects in this riding
Infrastructure Canada projects in the towns and cities of Notre-Dame-de-Grâce—Westmount: transit, water, housing, recreation and more. Programs approve the funding, not individual MPs, so this shows what was funded here, not what one person delivered.
- Federal money
- $27.0M
- Completed
- 20
- Under construction
- 0
- Not started
- 0
Showing 20 of 20 projects, newest approval first
-
Reconstruction of the sports and recreation centerCompleted$6,278,364federal, of $19.3M total cost
-
Upgrading of exterior landscaping elementsCompleted$195,011federal, of $243.8K total cost
-
Repairs and upgrading of sanitary infrastructureCompleted$235,123federal, of $295.9K total cost
-
Renovation of doorsCompleted$114,984federal, of $143.7K total cost
-
Upgrading of accessibility equipment for people with reduced mobilityCompleted$148,000federal, of $185.0K total cost
-
Repair and upgrades to the University Family Medicine Group (GMF-U) department as well as to the H Norma and Robert Hayes buildings of the St. Mary's Hospital Center (SMHC)Completed$1,160,000federal, of $1.5M total cost
-
Replacement of MCCs (Main Electrical Distribution) at Lakeshore General Hospital (LGH) - Phase 5Completed$2,135,669federal, of $2.7M total cost
-
Increase in the capacity of the electrical panel at the long term care facility - Centre d'hébergement (CH) de LachineCompleted$960,000federal, of $1.2M total cost
-
Increasing the capacity of the electrical panel in the basement of the Foyer building at the Residential and Long-Term Care Centre (CHLSD) DorvalCompleted$640,000federal, of $800.0K total cost
-
Refurbishment of the envelope of building 01400-01 at Hôpital Sainte-AnneCompleted$800,000federal, of $1.0M total cost
-
Replacement of the 600-3 phase secondary distribution panels (1 hand and 4 circuits) at the Sainte-Catherine building of the Sainte-Catherine building of the Centre de soins prolongés Grace DartCompleted$263,637federal, of $329.5K total cost
-
Repair of the south side exits of the Centre de soins prolongés Grace DartCompleted$520,000federal, of $650.0K total cost
-
Roof repair at the Dobell building of the Douglas Mental Health University InstituteCompleted$600,000federal, of $750.0K total cost
-
Replacement of wastewater pipes and sewage separationCompleted$285,200federal, of $855.6K total cost
-
Renewal of water pipesCompleted$869,096federal, of $2.5M total cost
-
Program for the renewal of drinking water and wastewater pipes (PRECO)Completed$206,284federal, of $665.7K total cost
-
Program for the renewal of drinking water and wastewater pipes (PRECO)Completed$424,523federal, of $1.4M total cost
-
Program for the renewal of drinking water and wastewater pipes (PRECO)Completed$294,203federal, of $949.4K total cost
-
Construction of a sports complexCompleted$9,984,720federal, of $30.0M total cost
-
Program for the renewal of drinking water and wastewater pipes (PRECO)Completed$926,024federal, of $3.0M total cost
How to read this page
- The office budget pays for the MP’s staff and offices. Infrastructure money flows through federal programs, often with provinces and cities, and goes to the recipient listed on each project.
- Projects are matched to ridings by the town or city named in Infrastructure Canada’s records. A project in a city covering several ridings is counted as “shared” and left out of the totals unless you include it.
- Status comes from reported construction dates. Some projects finish before their dates are updated.