Quebec
Thérèse-De Blainville
Data updated November 26, 2026.
Talk to your MP’s office
Updates and events from the verified MP office, and questions and feedback from people in Thérèse-De Blainville. Please follow the community guidelines.
Loading the conversation…
Loading posts…
Office budget and spending
Every MP gets an annual budget to run their Ottawa and riding offices: staff, travel, mail-outs and contracts. It isn’t money for local projects.
Office budget for 2026–27, set by the House of Commons Board of Internal Economy
- Basic budget (same for every MP)$441,600
- Elector supplement (many voters)$38,910
$137,126 spent in the first quarter of 2026–27, 29% of the year’s budget.
Spending reported by the office
| Quarter | Staff salaries | Travel | Hospitality | Contracts | Total |
|---|---|---|---|---|---|
| Apr–Jun 2025 | $3,350 | $0 | $100 | $9,060 | $12,510 |
| Jul–Sep 2025 | $76,161 | $14,305 | $200 | $12,107 | $102,772 |
| Oct–Dec 2025 | $87,871 | $9,434 | $135 | $21,937 | $119,377 |
| Jan–Mar 2026 | $125,611 | $11,610 | $2,793 | $45,593 | $185,608 |
| Apr–Jun 2026 | $82,201 | $19,800 | $1,032 | $34,093 | $137,126 |
| Since April 2025 | $375,194 | $55,148 | $4,260 | $122,790 | $557,392 |
April to June 2025 can include spending by the previous MP before the election on April 28, 2025. Constituency office rent and some central costs are paid from other budgets and aren’t shown here.
Federal projects in this riding
Infrastructure Canada projects in the towns and cities of Thérèse-De Blainville: transit, water, housing, recreation and more. Programs approve the funding, not individual MPs, so this shows what was funded here, not what one person delivered.
- Federal money
- $29.0M
- Completed
- 33
- Under construction
- 1
- Not started
- 0
Showing 34 of 34 projects, newest approval first
-
Gymnasium floorCompleted$340,000federal, of $425.0K total cost
-
Building envelope workCompleted$390,282federal, of $487.9K total cost
-
Roofing worksCompleted$1,060,000federal, of $1.3M total cost
-
Replacement of BoilerCompleted$232,000federal, of $290.0K total cost
-
Replacement of BoilerCompleted$251,254federal, of $314.1K total cost
-
Gymnasium floorCompleted$180,000federal, of $225.0K total cost
-
Purchase of a roof ventilation unitCompleted$84,800federal, of $106.0K total cost
-
Replacement of the boiler for the heating of the Cégep de Lionel-Groulx poolCompleted$25,634federal, of $67.9K total cost
-
Construction of a new arenaUnder construction$6,358,218federal, of $19.1M total cost
-
Replacing the flat roof cover and the outer casing (part 2/2)Completed$2,543,083federal, of $3.2M total cost
-
Replacement of exterior doorsCompleted$149,109federal, of $186.4K total cost
-
Roof replacementCompleted$673,005federal, of $841.3K total cost
-
Replacement of exterior doorsCompleted$87,101federal, of $108.9K total cost
-
Renovation of sanitary blocksCompleted$476,036federal, of $595.0K total cost
-
Replacement of ceilingsCompleted$640,000federal, of $800.0K total cost
-
Replacement of a staircaseCompleted$238,614federal, of $298.3K total cost
-
Replacement of cold / heat production units and roof repair projectCompleted$4,640,000federal, of $5.8M total cost
-
Replacement of heat / cold production units and roof repair projectCompleted$3,396,803federal, of $4.2M total cost
-
Roadway and steps rehabilitationCompleted$320,000federal, of $400.0K total cost
-
Replacement of exterior doorsCompleted$229,711federal, of $287.1K total cost
-
Replacement of exterior doorsCompleted$133,036federal, of $166.3K total cost
-
Roof replacementCompleted$1,302,183federal, of $1.6M total cost
-
Intercommunication system replacementCompleted$19,625federal, of $80.0K total cost
-
Renovation of Hot and Cold Air Production SystemsCompleted$828,224federal, of $1.3M total cost
-
Oil Tank and Generator UpgradesCompleted$156,815federal, of $196.0K total cost
-
Roof Repair of the Léger WingCompleted$491,353federal, of $701.9K total cost
-
Reconstruction and expansion of a baseball fieldCompleted$677,200federal, of $2.1M total cost
-
Water Systems UpgradesCompleted$414,880federal, of $1.0M total cost
-
Program for the renewal of drinking water and wastewater pipes (PRECO)Completed$456,446federal, of $1.5M total cost
-
Highway 117 ImprovementsCompleted$1,565,000federal, of $3.1M total cost
-
Program for the renewal of drinking water and wastewater pipes (PRECO)Completed$332,411federal, of $1.1M total cost
-
Program for the renewal of drinking water and wastewater pipes (PRECO)Completed$210,709federal, of $680.0K total cost
-
Program for the renewal of drinking water and wastewater pipes (PRECO)Completed$45,668federal, of $147.4K total cost
-
Cross Track BlainvilleCompleted$27,909federal, of $55.8K total cost
How to read this page
- The office budget pays for the MP’s staff and offices. Infrastructure money flows through federal programs, often with provinces and cities, and goes to the recipient listed on each project.
- Projects are matched to ridings by the town or city named in Infrastructure Canada’s records. A project in a city covering several ridings is counted as “shared” and left out of the totals unless you include it.
- Status comes from reported construction dates. Some projects finish before their dates are updated.