Ontario
York—South Simcoe
York—Simcoe-Sud
Data updated November 26, 2026.
Talk to your MP’s office
Updates and events from the verified MP office, and questions and feedback from people in York—South Simcoe. Please follow the community guidelines.
Loading the conversation…
Loading posts…
Office budget and spending
Every MP gets an annual budget to run their Ottawa and riding offices: staff, travel, mail-outs and contracts. It isn’t money for local projects.
Office budget for 2026–27, set by the House of Commons Board of Internal Economy
- Basic budget (same for every MP)$441,600
- Elector supplement (many voters)$38,910
- Geographic supplement (large area)$7,180
No spending reports were found for this MP yet. New MPs appear after their first full quarter.
Federal projects in this riding
Infrastructure Canada projects in the towns and cities of York—South Simcoe: transit, water, housing, recreation and more. Programs approve the funding, not individual MPs, so this shows what was funded here, not what one person delivered.
- Federal money
- $47.3M
- Completed
- 35
- Under construction
- 1
- Not started
- 1
Showing 37 of 37 projects, newest approval first
-
177 Church St. Community HubCompleted$5,365,865federal, of $10.3M total cost
-
Scanlon Creek Nature CentreUnder construction$4,174,783federal, of $7.0M total cost
-
Loretto Watermain Replacements and Well RehabilitationCompleted$750,000federal, of $1.9M total cost
-
Rehabilitation of Bond Head SidewalksCompleted$315,863federal, of $394.8K total cost
-
Simcoe Manor LTC Home HVAC and boiler replacementsCompleted$93,497federal, of $116.9K total cost
-
Creation of additional Municipal office spacesCompleted$76,000federal, of $95.0K total cost
-
New Tecumseth Recreation Centre Roof ReplacementCompleted$393,116federal, of $491.4K total cost
-
Construction of a Multi-Use Accessible Pedestrian Trail along Boyne River in community of AllistonCompleted$160,002federal, of $392.3K total cost
-
Improvements to Riverdale Park in AllistonCompleted$491,292federal, of $1.2M total cost
-
Accessibility Upgrades to 3 Municipal Public ParksCompleted$106,387federal, of $266.0K total cost
-
Holland Marsh Polder Phosphorus Reduction FacilityNot started$16,000,000federal, of $40.0M total cost
-
Reconstruction of a Section of Concession Road 5 Including Replacement of Two Bridge StructuresCompleted$1,173,000federal, of $2.3M total cost
-
Bradford West Gwillimbury (BWG) Transit - Fleet Replacement and ExpansionCompleted$230,580federal, of $576.5K total cost
-
New Construction, Standby Emergency Power for Wells #1, #4, #8, and Hillcrest Pump StationCompleted$412,500federal, of $875.0K total cost
-
The Simcoe Road Stormwater Management Facility Remediation and Restoration ProjectCompleted$89,215federal, of $373.0K total cost
-
Replacement of two 125 horsepower conventional aeration blowers with one 150 horsepower magnetic bearing blower at Regional Wastewater Treatment Plant (WWTP)Completed$117,915federal, of $241.5K total cost
-
Design for the Upgrade High Lift Pump at Hillcrest Well, at 47 George Street, Alliston, OntarioCompleted$13,056federal, of $26.1K total cost
-
Upgrades to Well #1 including replacement of pump with a higher rated pump, and the increase size of the Chlorine Contact Chamber, at 46 Fletcher Lane, Alliston, OntarioCompleted$168,500federal, of $337.0K total cost
-
Replacement of Single Train Membrane at Raymond A. Barker Water Treatment Plant located at 2 Raglan Street, CollingwoodCompleted$236,785federal, of $473.6K total cost
-
The Morris Road Drain and Stormwater Management FacilityCompleted$1,009,413federal, of $2.0M total cost
-
Connection of the Loretto area and Weca area water systems in the Township of Adjala TownshipCompleted$74,589federal, of $205.0K total cost
-
Addition vehicle for growth of serviceCompleted$76,387federal, of $167.5K total cost
-
Highway 400 - Regional Road 88 Bridge RehabilitationCompleted$200,000federal, of $400.0K total cost
-
New Shelter for the Alliston District Humane SocietyCompleted$266,667federal, of $800.0K total cost
-
8th Line/Dissette ReconstructionCompleted$1,972,000federal, of $12.0M total cost
-
Colborne Street ReconstructionCompleted$540,334federal, of $1.6M total cost
-
Everett Reservoir RepairsCompleted$14,051federal, of $92.5K total cost
-
Pave Sideroad 30 - AdjalaCompleted$44,050federal, of $138.4K total cost
-
Resurfacing Concession Road 7Completed$77,541federal, of $239.7K total cost
-
Construction of Bradford West Gwillimbury Library and Cultural CentreCompleted$3,586,210federal, of $15.8M total cost
-
Replacement of Concession Rd 7 BridgeCompleted$370,239federal, of $1.1M total cost
-
Construction of the Bradford West Gwillimbury Sports and Leisure CentreCompleted$8,241,666federal, of $24.7M total cost
-
Restoration of the Monument BuildingCompleted$65,934federal, of $197.8K total cost
-
Town of New Tecumseth - Asset Management ProjectCompleted$7,237federal, of $21.7K total cost
-
Township of Adjala-Tosorontio Asset Management ProjectCompleted$4,872federal, of $14.6K total cost
-
Asset Management ProjectCompleted$6,661federal, of $20.0K total cost
-
Replacement of Kingsley and 12th Line BridgesCompleted$327,667federal, of $983.0K total cost
How to read this page
- The office budget pays for the MP’s staff and offices. Infrastructure money flows through federal programs, often with provinces and cities, and goes to the recipient listed on each project.
- Projects are matched to ridings by the town or city named in Infrastructure Canada’s records. A project in a city covering several ridings is counted as “shared” and left out of the totals unless you include it.
- Status comes from reported construction dates. Some projects finish before their dates are updated.